The days of printing dozens of large architectural blueprints and waiting in line at City Hall are largely a thing of the past in British Columbia.
Almost all major municipalities—including the City of Vancouver (ePlan), City of Surrey (MyCity), City of Burnaby, Richmond, and Coquitlam—now operate fully digital submission portals.
For homeowners and developers, this digital shift creates great opportunities to manage front-end filings directly. Here is your practical guide on what you can easily DIY when applying online, and where technical plan review demands professional support.
1. How to Find & Access Your City's Online Portal
Every BC municipality has its own distinct digital intake portal and specific submission protocols. You can access your city's official system in three easy steps right from our website:
- Visit our Service Area Hub.
- Select your municipality (e.g. Vancouver, Surrey, Burnaby, Richmond, Coquitlam, Kelowna).
- Click on the 3rd icon: Online Application.
This will take you directly to your city's dedicated page with step-by-step application instructions, required portal links, and local intake guidelines.
2. What You CAN (and Should) DIY on City Portals
Managing your own online permit submission is straightforward and avoids third-party administrative markups:
A. Creating Your Municipal Portal Account
Setting up your user profile on systems like Vancouver ePlan or Surrey MyCity takes only a few minutes. You will need your property’s civic address, legal description (Lot, Block, Plan), and standard contact details.
B. Uploading Completed Drawing Packages & Forms
Once Canadian Blueprint coordinates and delivers your permit-ready architectural and engineering drawing package, you can log into your account, upload the organized PDF files directly, and submit the application.
C. Paying City Intake Fees Directly
Municipal plan review fees, damage deposits, and application charges can be paid directly through the online portal using a credit card or electronic funds transfer. Paying the city directly ensures you never pay third-party surcharges on municipal fees.
D. Tracking Application Status in Real Time
Digital portals allow you to track which municipal departments (Zoning, Building, Plumbing, Electrical, Tree Protection, Environmental) have reviewed your file and when status updates occur.
E. Direct Permit Ownership (Why This Protects You)
Submitting under your own account gives you total legal and operational control over your project:
- For Property Owners: If you ever need to change general contractors, part ways with a builder, or manage sub-trades directly, you retain full ownership of the permit file. You never have to beg a former contractor to transfer the file or face starting the municipal application from square one.
- For General Contractors & Builders: Having the property owner hold the primary applicant role provides clear legal boundaries. If contractual or payment issues ever arise, you aren't stuck holding regulatory liabilities on a property you don't own.
2. Where the Line Is Drawn: Navigating Municipal Review Comments
While uploading a PDF file is easy, securing an approval depends entirely on the technical quality of the drawing package and how you respond to municipal review comments:
1. Document Standards & Digital Layering
Municipalities enforce strict formatting guidelines. Drawings must be submitted as vector PDFs with correct page orientations, scale bars, standardized title blocks, and digital stamps. Scanned hand sketches with uncalibrated scales will be rejected at the intake gate.
2. Resolving Plan Checker Deficiency Letters
Once an application is under review, municipal plan checkers issue written Deficiency Reports or Review Comment Letters citing specific sections of the 2024 BC Building Code and local zoning bylaws.
Successfully addressing these comments requires:
- Drafting revised floor plans, elevations, or wall sections that resolve the cited code conflict.
- Providing technical code justification or alternative solutions.
- Re-coordinating structural (Schedule B) or energy advisor modeling if layouts change.
An amateur response that fails to resolve the cited code conflict will trigger secondary and tertiary review cycles—adding months of delay to your construction timeline.
3. How Canadian Blueprint Supports Your Application
Whether you want to submit your drawings yourself or have our team manage the entire process, we adapt to your workflow:
- Direct Permit Packages: We provide you with complete, permit-ready PDF sets formatted to your municipality's exact digital submittal standards so you can upload them yourself.
- Full Application Management: If you prefer a hands-off experience, we act as your Authorized Agent—managing the portal, coordinating required engineering disciplines, and resolving all plan checker review comments through to final permit issuance.
So, Should You Do It Yourself?
Absolutely.
Registering on your city’s portal, uploading your documents, and paying municipal fees directly gives you 100% legal ownership over your permit file, eliminates third-party surcharges, and keeps you in full control.
And when you hit that inevitable speed bump—like organizing complex vector PDF layers, coordinating structural engineering schedules, or responding to a municipal plan checker’s deficiency letter—don't worry, our team is ready to step in and handle the technical heavy lifting.
Request a Free Feasibility Check | Explore Full Permit Application Services
Canadian Blueprint Inc.
BC Building Design & Permit Drawings
Published August 14, 2026